May. 23rd, 2017

Moving Out

May. 23rd, 2017 05:20 pm
kevin_standlee: (Lisa)
...but only a few meters.

We have a planned project to work on the carport for which the concrete laying last fall was the first stage. In order to do this, we need to have the travel trailer off the slab for a few days.

Moving Day )

In the heat we're having here, Lisa didn't want to keep the electricity disconnected very long. We ran two long extension cords from the power pedestal to the trailer. I gingerly opened the pedestal cover and was not too surprised to find a black widow spider there — it's just the sort of place that spiders like that seem to like. I got my heavy gloves and a broom and turned her into an ex-spider. We then connected the extension cords so that both the 30A and 20A circuits are connected to the trailer. The air conditioning started up with no problem. The refrigerator is off and defrosting at the moment, and will be out of use until she moves the trailer back inside, because the trailer is now a little off level. You must not run the refrigerator with it not level; you'll ruin it.

We currently anticipate being on this very short road trip for about a week while we clean the carport and undertake the other half of the project that started last October but was put on hold due to weather. With summer about here and a three day weekend ahead (which is one reason we'll not be at BayCon), it's high time to get back to work on improvements to Fernley House.

August 2017

S M T W T F S
   1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20212223242526
2728293031  

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 23rd, 2017 09:21 pm
Powered by Dreamwidth Studios