kevin_standlee: (House)
[personal profile] kevin_standlee
Initially we were going to leave the area where the leaky pipe was replaced uncovered until today to make sure there weren't any late leaks in the repair, but Lisa decided to go ahead and pour the gravel for the dry well and cover the lines back up late in the evening after all. This turns out to have been a very good thing, as the temperature went down to -3°C last night and it wouldn't have done to have the exposed line freeze, albeit that access to it would have been pretty easy.
This account has disabled anonymous posting.
(will be screened if not validated)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

May 2025

S M T W T F S
     1 2 3
4 5 6 78 9 10
11 12 13 14 15 16 17
18 19 20 21 222324
25262728293031

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 24th, 2025 03:29 am
Powered by Dreamwidth Studios