Nov. 4th, 2014

kevin_standlee: (House)
It may not sound like much, but today's work on the house consisted of drilling a hole.

But it's an important hole )

My contribution was to pull on stuff passed through the hole and to fetch and carry things upon demand, but Lisa did most of the work. She says that once that conduit (and the wire) is up through the floor, we're about 97% done with the stuff she has to do. At that point, we call our plumber and say, "We're ready; bring on the water heater."

August 2025

S M T W T F S
      1 2
3 4 5 6 78 9
10 111213141516
17181920212223
24252627282930
31      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 15th, 2025 07:47 am
Powered by Dreamwidth Studios