Nov. 20th, 2017

kevin_standlee: (House)
With the roof peak pieces finished, we could use the test rig to get the spacing right for the two base rails of the carport. This meant it was time to start pouring more concrete and drilling holes in concrete, depending on the specific anchorages.

A Firm Foundation )

Lisa was very concerned that this structure not blow over in the wind storms we get here. With both concrete bolts drilled into the pad and additional concrete post holes holding it down, we reckon that nothing short of a tornado is going to budge this thing.

August 2025

S M T W T F S
      1 2
3 4 5 6 78 9
10 11121314 1516
1718 1920212223
2425262728 2930
31      

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 1st, 2025 01:35 pm
Powered by Dreamwidth Studios