Nov. 20th, 2017

kevin_standlee: (House)
With the roof peak pieces finished, we could use the test rig to get the spacing right for the two base rails of the carport. This meant it was time to start pouring more concrete and drilling holes in concrete, depending on the specific anchorages.

A Firm Foundation )

Lisa was very concerned that this structure not blow over in the wind storms we get here. With both concrete bolts drilled into the pad and additional concrete post holes holding it down, we reckon that nothing short of a tornado is going to budge this thing.

October 2025

S M T W T F S
   1234
567891011
121314 15161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Oct. 19th, 2025 07:31 pm
Powered by Dreamwidth Studios