Box Painting Time
Sep. 23rd, 2018 03:01 pmLisa completed the lower portion of the new small wood box (the roof will be a separate piece added later) and that meant it was time to start painting.
( Get Out the Paint )
There's still work to be done on the large wood box, including painting those bits that couldn't be done without splattering the house, and Lisa also wants to do some repainting on the front porch, which does need it. The sun is very harsh here, and painted surfaces have to be redone regularly. (I'm really glad our house has metal siding.) This afternoon, I cut back bushes from the porch and scrubbed old peeling paint from the area that will be painted first. Lisa says she wants to first tackle the area where the small wood box will go, which makes sense because obviously that has to be done before we can put the box where it will sit for the winter.
( Get Out the Paint )
There's still work to be done on the large wood box, including painting those bits that couldn't be done without splattering the house, and Lisa also wants to do some repainting on the front porch, which does need it. The sun is very harsh here, and painted surfaces have to be redone regularly. (I'm really glad our house has metal siding.) This afternoon, I cut back bushes from the porch and scrubbed old peeling paint from the area that will be painted first. Lisa says she wants to first tackle the area where the small wood box will go, which makes sense because obviously that has to be done before we can put the box where it will sit for the winter.