Jan. 16th, 2020

kevin_standlee: (Trains)
Some of you may recall that back in June, Union Pacific came through and replaced the track and the mainline switch leading into the Fernley House Tracks across from our house. In the wake of that job they left a pile of junk railroad ties (sleepers). Yesterday, UP finally cleared the ties, using a variety of interesting equipment.

Round 1: The Crane and the Flatbed )

Later in the day, a set of small self-propelled maintenance of way equipment consisting of a mini-gondola and a transport car holding an excavator that appeared to also supply the power for the transport car eased into the Fernley House Track, after which I got to see equipment moves that I'd not seen before.

Giant Claw Action )

This morning, the crew were back to get moving down the railroad to their next job. After negotiating a work window with the dispatcher after Amtrak came through (running almost ten minutes early), it was time to reverse the steps from yesterday.

More Heavy Equipment, with Video )

Having put itself back together and with a maintenance window in which to work, the crew slowly rolled away to their next task.

I'm glad to have the ties gone, but I suspect that the chipmunks and rabbits that appeared to be have been using the pile as a nest were less than pleased.

October 2025

S M T W T F S
   1234
567891011
121314 15161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Oct. 19th, 2025 05:20 pm
Powered by Dreamwidth Studios