Jun. 5th, 2020

kevin_standlee: (House)
While we worked on de-scaling the side grills on the swamp cooler, we also had to deal with the bigger problem, which was a tremendous accumulation of crud in the cooler's water pan.

Cheaper Than Buying a New One, Barely )

Our trip over to Fallon a couple of days ago included shopping for both tools and treatments we weren't able to find in Fernley. That was a success, so Lisa got to work.

It's a Grind(er) )

We're significantly down the restoration path now. Repainting can start as early as tomorrow as the pan is currently sitting in the sun drying out from the rust-prevention treatment. There will still be rounds of waiting for coats of paint to dry after that, but when that's done, we should be able to reassemble the cooler and get it working again.

August 2025

S M T W T F S
      1 2
3 4 5 6 78 9
10 11121314 1516
17181920212223
24252627282930
31      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 19th, 2025 02:18 pm
Powered by Dreamwidth Studios