Jun. 17th, 2020

kevin_standlee: (House)
The ironic things about us putting all of the effort into refurbishing the swamp cooler is that we've had a cool snap, and I even had to put on a sweater this morning. However, this also means that the coats of paint that Lisa applied to the cooler pan have had more than a week to cure in preparation for being immersed in water again.

This afternoon, I completed what I think was the final step of the refurbishment.

Top Coat )

Now all we need is some hot weather and we'll be ready to go. Looking at the forecast, we won't have long to wait.

September 2025

S M T W T F S
 1 23456
78910111213
14151617181920
21222324252627
282930    

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 8th, 2025 04:58 am
Powered by Dreamwidth Studios