Sep. 4th, 2021

kevin_standlee: (House)
As some of you who follow me may recall, last year about this time, Lisa undertook to remove the rotting boards on the small deck outside the back door at Fernley House. She got partway through this project before the weather put the whole thing on hold, and we covered it over with plywood so nobody would trip into it. We didn't get back to is last spring. As Labor Day is the end of summer and the weather has cooled back down to where we can get outside during daylight hours, and as the wildfire smoke has dissipated somewhat, it was time to restart the project.

Load of Lumber )

It will be nice to have this project completed. We might even start barbecuing things again. However, we'll have to be vigilant: because of the way winds swirl around the house, this area traps a lot of leaves and other debris.

October 2025

S M T W T F S
   1234
567891011
121314 15161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Oct. 20th, 2025 02:30 am
Powered by Dreamwidth Studios