Oct. 20th, 2014

kevin_standlee: (House)
As I wrote recently, Lisa concluded that the 1-inch conduit from the main electrical box (which contained the 50A circuit for the RV power pedestal) was too crowded to run a new 30A line for a proposed hot water heater connection. Therefore, we need to replace the 1-inch conduit with 1 1/4-inch conduit. We started working on that on Sunday.

Conduit Work Photos )

The EMT and PVC conduit itself and most of the various connectors (except the reducing bushing) we were able to get from Lowe's. This means we've been to three separate stores in three cities in order to get all of the parts we need. This afternoon Lisa has started working on bending and cutting the EMT and preparing the junction box. It's a lot of work, but Lisa is confident that it will all come together.

August 2025

S M T W T F S
      1 2
3 4 5 6 78 9
10 11121314 1516
1718 1920212223
24252627282930
31      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 24th, 2025 07:41 pm
Powered by Dreamwidth Studios