Plan C Progresses
Oct. 22nd, 2014 06:04 pmWe have completed some of the hardest parts of Electrical Plan C.
( It's a Grind )
On Tuesday, Lisa did some more digging (the new conduit goes slightly deeper than the old), cemented the PVC conduit, attached the EMT, and hooked it up to the circuit box. It was time to start pulling wire.
( Wired Up )
Tomorrow Lisa plans to reconnect the RV lines (the main line to the RV pedestal has the proper color coded wires) so we can re-energize that circuit. Then she needs to work on running the 10/3 line through the 3/4-inch flexible conduit in preparation for drilling a hole through the bathroom floor and running conduit up from underneath the house. We figure that wire-pulling job should be much easier than what we did yesterday.
( It's a Grind )
On Tuesday, Lisa did some more digging (the new conduit goes slightly deeper than the old), cemented the PVC conduit, attached the EMT, and hooked it up to the circuit box. It was time to start pulling wire.
( Wired Up )
Tomorrow Lisa plans to reconnect the RV lines (the main line to the RV pedestal has the proper color coded wires) so we can re-energize that circuit. Then she needs to work on running the 10/3 line through the 3/4-inch flexible conduit in preparation for drilling a hole through the bathroom floor and running conduit up from underneath the house. We figure that wire-pulling job should be much easier than what we did yesterday.